Light your way with this re-surfacing methodology!
Pro-Teq Surfacing (UK) Ltd, developed and patented a world first for spraying a liquid based product in combination with either soft or hard media. This pathway re-surfacing methodology called STARPATH is the result of an extensive period of chemical trials. Comprising a multitude of product samples, mix ratios and application techniques. STARPATH is currently being trialled in Christ’s Pieces, a well-known park in the east side of the centre of Cambridge by Cambridge City Council.
The aggregate material absorbs and stores energy from ambient light (UV rays) during the day, then releases this energy at night allowing the particles to glow, see this link
This product is cost effective to both install and maintain while its seamless surface may be applied to any existing surface, be it concrete, tarmac, timber or any hard stand substrate (solid base).
It can achieve environmental appeal beyond the obvious reduction in council bills. As a resurfacing technique, which does not require the existing surface to be removed, the Pro-Teq alternative advantages over those products offered by its competitors, including savings realised through carbon credits, reducing the council carbon footprint.
It effectively generates its own energy during the day while radically enhancing visibility at night, which assists pathway users. It is perfect for cyclist and disabled access and has also safety margin with its anti-slip properties. It can also help to reduce the risk of collisions between cyclists and pedestrians at night without having to resort to artificial painted centre lines. The aggregate is a non-reflective light source, the lack of any glare off the surface further enhancing its acceptance in more populated areas. (eg: if this product were to be laid on a driveway in a private residence, there would be no adverse impact on neighbouring properties).
This product has recently been sprayed onto the existing pathway that runs through Christ’s Pieces open space, Cambridge between the city centre and the Grafton Centre, and is used by pedestrians and cyclists during the day and night.
The Cambridge pathway measures 150 square metres, took 30 minutes to spray the material on, and the surface was ready for use less than four hours after the job commenced.
Find out more about this material here.
Comments